Manufacturing

Much of the data a plant runs on never reaches the ERP.

We connect the plant floor to the business systems with care, so that decisions rest on what the machines actually did.

Relevant capabilities

Overview

Most manufacturers run two technology estates that were built by different people for different purposes. The ERP, planning and quality systems work in orders, materials and costs, while PLCs, SCADA, historians and the MES work in tags, cycles and states and were engineered to keep a line running for decades. When the ERP records that an order consumed its standard quantity, the line holds its own record of what was actually used, scrapped and reworked, and most plants reconcile the two by hand in a spreadsheet at the end of each shift.

Closing that gap takes more care than an ordinary integration project, because plant networks are segmented for good reason and a write to the wrong tag can stop a line or injure someone. Equipment from different decades uses different protocols, and the same signal usually carries a different name on each machine. Maintenance windows are short and planned months ahead, so software that an office would patch on any weekday has to wait on the plant floor until the next shutdown.

Our work is the join between the two estates, which means getting plant data out safely, giving it context from the MES and ERP and putting it where planners, quality engineers and maintenance teams can use it. We are software and data engineers and do not work as controls integrators, so we do not program PLCs or change safety systems, and every connection we design lets production keep running if our side fails.

Industry challenges

The forces on technology leaders
  1. An ERP program that takes most of the budget

    Moving to a new ERP version takes years and absorbs most of the available money and people. Plant systems, integration and reporting are told to wait until after go-live, and they then inherit interfaces that were designed late and tested against only a fraction of real production orders.

  2. Plant data that stays at each site

    Each site has its own historian, MES configuration and tag names, so even a simple question, such as which line makes a given part with the least scrap, cannot be answered across sites without weeks of manual extraction and a dispute about definitions.

  3. Security exposure from connected equipment

    Each new connection between the office and plant networks gives an attacker another possible path. Because controllers run for decades on software that cannot be patched quickly, security teams tend to refuse such connections by default, and useful projects stall while that answer stands.

  4. Knowledge leaving with retiring engineers

    The people who understand why a line behaves the way it does are approaching retirement, and most of what they know is held in shift notes, maintenance work orders and their own memory. New technicians often face the same fault with a manual in hand and no one experienced to ask.

  5. Traceability questions that arrive without warning

    When a customer or regulator asks which finished units contain a suspect batch of material, the answer is spread across the ERP, the MES and paper travelers. How large a recall becomes depends on how quickly and how narrowly you can answer that question.

Transformation opportunities

Where technology changes the result
  • One production record across ERP and MES

    Orders, operations, material consumption and quality results can be joined into one record for each unit or batch. That makes the variance between standard and actual visible on the same day and at the operation where it occurred, so it no longer waits for the month-end cost report.

  • Maintenance planned from machine condition

    When vibration, temperature and cycle data from the historian are joined with work order history, maintenance planners can see which assets are drifting. The model itself matters less than the supporting work, which means clean signals, labelled failures and an alert that arrives in the maintenance system as a work request.

  • Quality problems caught at the station

    Analyzing process parameters together with inspection results shows which settings tend to come before defects. A quality engineer can then spot the pattern during the run and adjust, rather than finding out from a rejected lot at final inspection or from a customer complaint.

  • A searchable memory for the maintenance floor

    Manuals, work orders, shift logs and root cause reports can be indexed so that a technician who asks about a fault code gets the past fixes, each cited to its source document. Access follows site and role, and the tool has read access only.

  • Supplier documents processed without retyping

    Certificates of analysis, order confirmations and delivery notes are read automatically, the extracted values are checked against the purchase order and uncertain fields go to a person. Buyers and receiving clerks then deal with the exceptions and no longer key every document into the ERP.

Relevant capabilities

The services that matter most here, and why

What shapes the engineering

Regulatory, data and operational constraints
  1. Plant networks are segmented from office networks

    Control systems are segmented from business systems, commonly following the zone and conduit model described in the IEC 62443 standards. We design data flows that leave the plant through a controlled boundary, in one direction where that is possible, and we never require inbound access to controllers.

  2. Read from equipment, write with great care

    Reading a tag is low risk, but writing a setpoint is a different matter, so we treat any write back to plant systems as a separate decision that involves your controls engineers, your change process and a tested fallback. Safety systems remain outside the scope of anything we build.

  3. Validated and audited records in regulated production

    Regulated sectors such as medical devices, pharmaceuticals and aerospace have to keep production and quality records that are attributable, complete and protected against undetected change. Any system that creates or alters those records needs audit trails and documented validation, which affects how we test and release.

  4. Change happens in maintenance windows

    A plant that runs around the clock cannot absorb a failed deployment at shift change, so we plan releases around scheduled downtime and rehearse the rollback beforehand. We also make sure that the line can keep running on local systems if its connection to anything central is lost.

In practice

Three situations from this industry, and what we would do in each.

Scrap that appears only at month end

The situation
A mid-size manufacturer of machined components sees material variance in its monthly cost report but cannot trace it to a line, shift or part. The MES records scrap at each operation while the ERP records consumption at standard, so a cost accountant reconciles the two with a spreadsheet, weeks after the parts have shipped.
What we would build
We would map how scrap and consumption are recorded in each system, agree one definition with production and finance and build a daily pipeline that joins MES operation records to ERP production orders. Mismatched order numbers and late confirmations would go to an exception list so that they are kept and reviewed, and a report would show variance by line, shift and operation the following morning.
What it is designed to change
The aim is that a production supervisor can act on variance within a day, where today finance explains it after the month has closed. We would measure the time between a scrap event and its appearance in a report that names the operation.

A maintenance team losing its most experienced technicians

The situation
A process plant holds decades of work orders, shift logs and vendor manuals in a maintenance system, on shared drives and in filing cabinets. The senior technicians who know the equipment are close to retirement, and newer staff spend the first part of each breakdown looking for how the fault was fixed the last time.
What we would build
We would index the work orders, manuals and scanned logs while keeping the asset hierarchy from the maintenance system, so that a search can be limited to one machine. Retrieval would be tested against real fault descriptions, using answers approved by senior technicians. Each answer cites its source document, and because the tool is read-only it can suggest a fix while the decision stays with the technician.
What it is designed to change
A technician should be able to find the relevant past repair without knowing whom to ask. We would check how often the correct earlier work order appears among the first few answers for a set of real faults, and repeat that check whenever documents are added or the search is tuned.

Several plants, several definitions of downtime

The situation
A food manufacturer with several plants reports equipment effectiveness to its board, although each site calculates availability in its own way and one counts changeovers as downtime while another does not. Machine states come from different PLC vendors and are logged under different tag names in each historian, so comparisons between sites tend to lead to arguments where they should lead to decisions.
What we would build
We would agree a single machine state model and metric definitions with operations leaders, and then map each site's tags to that model in a maintained mapping table kept outside the code. Data would leave each plant through an outbound-only connection to a central platform, while sites keep their local dashboards. The group view would be built on the shared definitions and would mark any figure that is estimated.
What it is designed to change
A plant comparison would then mean the same thing at every site, and adding a new line would be a matter of mapping its tags with no new report to write. Progress would show in how many of the reported metrics can be traced back to one written definition.

Business outcomes

What the work is meant to change
  • Decisions based on what the line did

    Planners, cost accountants and quality engineers work from the same record of actual production, which moves the discussion away from whose number is right and toward what to change on the line.

  • Fewer surprises from equipment

    Condition data reaches maintenance planners as work requests they can schedule, so a larger share of repairs happens during planned downtime and fewer of them interrupt a customer order.

  • Faster answers to traceability questions

    When a material batch is under suspicion, the affected units are identified from joined ERP and MES records rather than from paper travelers, which keeps any containment action narrow.

  • Systems your own engineers can run

    Plant IT takes over each pipeline and interface along with its tests, a decision log and runbooks that explain what to do when the historian gateway or an ERP interface stops during a night shift.

Questions leaders ask

We do not program controllers, configure SCADA or act as an MES implementer, and we would be wary of any software firm that claimed to do all of that. We work alongside your controls engineers and system vendors on the data and integration around those systems, which covers getting information out safely, joining it to ERP and quality data, and building the applications and analytics that use it.

It depends on how far the ERP program is from interface design. If the plant interfaces have not been specified yet, this is the best time, because the cost of a bad interface is largely fixed when it is designed. A two-week review can read the integration plan, the test data and the cutover approach and tell you which risks would stop a plant on go-live day, although if cutover is only weeks away we would advise you to wait.

We have the plant side push data out, and nothing outside is allowed to reach in. A gateway inside the plant network reads from the historian or an OPC UA server and publishes outward through a controlled boundary, and nothing in the business network or the cloud holds credentials for a controller. Your security and controls teams review the design before anything is installed, and they can switch the flow off without affecting production.

Usually you do not, since the first use case can run on what you already have, such as a database, the existing historian and a scheduler. We prefer to take one question, scrap by operation for example, to production on modest infrastructure before starting a platform program. If the first few use cases show that the current tools are the constraint, that becomes evidence for a platform decision, and the pipelines are written so that they can be moved.

In practice

An engagement from this industry

Other industries

Tell us what you are trying to change and we will tell you what it would involve.

Tell us what you are trying to do and where it is stuck. A principal reads every message and replies within one working day.

All services

Start a conversation.

A short paragraph is enough. A principal reads every message and replies within one working day.

Or email hello@farside.works. We use what you send only to reply. Privacy