Legacy data platforms rarely fail outright, and the usual reason for leaving one is that it has become slow, costly and difficult to staff. The appliance is at capacity and expanding it would mean another capital purchase, or the Hadoop cluster depends on administration skills that are getting harder to hire. Month-end queries queue behind one another, and the stored procedures and scheduled jobs that have accumulated over the years are left untouched because the team can no longer say which reports still depend on them.
The plan that carries the most risk is a single cutover, in which the new platform is built alongside the old one for a year and everything is switched over on one weekend. The business gets nothing it can use during that year, and the old system keeps changing while the project is trying to copy it. On the cutover weekend every difference between the old numbers and the new ones then appears at the same time, when there is too little time to investigate any of them properly.
We migrate one table group at a time, where a group is a set of related tables together with the jobs that load them and the reports that read them. The group runs in parallel on both platforms and is reconciled row for row and total for total until its owner signs off, at which point it is switched over and the old copies are retired. What we learn from converting and reconciling one group is applied to the next, and the business is working on the new platform long before the last group has moved.
Challenges we address
The failures we are usually called in to fix
Nobody knows what is still used
The legacy platform holds thousands of tables, views and jobs, and many of them feed nothing that anyone still reads. When there is no usage data, the migration plan has to treat every object as equally important, so months are spent moving objects that should have been deleted.
Translated SQL returns different numbers
Automated conversion copes with most of the syntax, but it does not account for the ways platforms differ in null ordering, decimal rounding, time zone behavior, case sensitivity and implicit type casts. A converted query can therefore run without error on the new platform and return a total that is slightly off, which is hard to trace to its cause.
Everything depends on one cutover weekend
When all objects switch at once, their problems also arrive together. On the Monday, finance may report a discrepancy while an extract to a downstream system is missing and a dashboard runs slowly, and the team has no quick way to tell which migrated object is responsible. Rolling back at that stage means losing the weekend's data.
A cloud bill larger than the old license
If the workload is copied across as it was, queries written for a fixed appliance scan whole tables on a platform that charges for use, and compute sized for the month-end peak keeps running for the rest of the month. The business case tends to be questioned as soon as the first invoices arrive.
Old and new platforms run together indefinitely
The last part of a migration is usually the most difficult, because it consists of the undocumented jobs, the consumers that are awkward to move and the reports that go to a regulator. Progress slows, the legacy platform is kept running for what remains, and the organization pays for two platforms that hold two sets of numbers.
Our approach
How the work runs, in order
Build the inventory from logs
We read the legacy platform's query logs, job schedules and dependencies to establish which objects are used, who uses them and how often. Anything unused goes on a retirement list and is left out of the migration. The remaining objects are grouped into sets of tables, jobs and reports that depend on one another, so that each set can be moved as a unit.
Choose the target on evidence
The choice between a warehouse, a lake and a lakehouse follows from the workload, meaning the balance of SQL reporting, data science and unstructured data, the concurrency at peak times and the skills your team already has. Before we recommend a platform, we run a sample of your real queries on each shortlisted one and compare what they cost and how fast they run.
Migrate one group completely
We choose a first group that is small but in real use and has a named business owner. Its data is moved, its code is converted and reviewed, its loads are rebuilt on the new platform, and a copy of its reports is pointed at the result. Automated conversion handles most of the code, and engineers then review each construct that is known to behave differently between the two platforms.
Reconcile, then cut over
While the old and new versions run in parallel, automated comparisons check row counts, column totals and row-level hashes after each load, and we explain and record every difference they find. Once the owner has signed off, the consumers are switched to the new platform. A rollback path stays open for an agreed period, after which the legacy objects are turned off.
Tune for the new cost model
As each group arrives on the new platform, we set partitioning or clustering to suit the queries that are run against it, size compute for each workload, and add auto-suspend and budget alerts. The small number of queries that account for most of the bill are rewritten. From the first group onward, cost is reported for each team and each pipeline.
Technical capabilities
What we design, build and operate
Legacy estate assessment
We analyze usage from query logs and schedulers across Teradata, Netezza, Oracle, SQL Server and Hadoop estates, and the result is a decision for each object to migrate it, rebuild it or retire it.
Platform selection
Cloud warehouses and lakehouses are trialed side by side on your own queries and data volumes, then compared on cost, performance, governance features and the effort each would take to operate.
Code conversion and review
We translate SQL dialects, stored procedures and legacy ETL jobs. Because automated tools miss some dialect differences, we work from a checklist of those differences and have engineers read the converted output.
Reconciliation tooling
On every parallel load, automated comparisons check the old platform against the new at the level of counts, aggregates and row hashes. The output is a difference report that the table owner can sign.
Lakehouse design
We design lakehouses on open table formats such as Apache Iceberg and Delta Lake over object storage, and choose the file layout, compaction and catalog to suit the way the data will be queried.
Hadoop offboarding
Hive tables, HDFS files and Spark or MapReduce jobs are moved to object storage and managed compute, and the cluster is shrunk in stages as the workloads leave it.
Cost and performance engineering
This covers partitioning and clustering, workload isolation, right-sized compute, auto-suspend, materialization choices and query rewrites, with the spend attributed to the teams and pipelines that incur it.
Security and access migration
We map the legacy roles and grants onto the new platform's access model, and put masking, row-level policies and network controls in place before the first sensitive table is moved.
Where it applies
Business applications
Appliance end of support
An on-premises warehouse has to be vacated before a hardware refresh or a support deadline, and the migration is ordered so that the most valuable workloads move first.
Hadoop cluster retirement
A cluster that is costly to administer is replaced with object storage and managed engines, which keeps the data available while the work of administering the cluster goes away.
Consolidating several warehouses
Platforms inherited through acquisitions or bought separately by departments are brought together, so that a single set of governed tables takes the place of several overlapping copies.
A platform for AI and data science
The move is to a platform where structured tables, documents and model workloads come under one set of access rules, which means an AI feature can use the governed data without needing a copy of its own.
A cloud bill higher than planned
A platform that has already moved to the cloud, but was copied across unchanged and now costs more than anyone planned, is re-engineered around the way the cloud charges for use.
In practice
Two situations this service is built for, and what we would do in each.
Insurance
An insurer leaving a warehouse appliance before renewal
The situation
An insurer runs its actuarial, claims and finance reporting on an on-premises warehouse appliance that is close to capacity and due for a support renewal. The platform holds stored procedures written over many years. An earlier migration plan proposed a single cutover, and it was shelved because the business would not accept that risk so close to year-end.
What we would build
We would start from the query logs to separate the objects that are in use from those that are not, and then group the live objects by subject, taking claims first, followed by policy and then finance. Each group would run in parallel on the new platform, with counts, totals and row hashes reconciled automatically after every load. Work on the second group would begin only after the claims owner had signed off the first.
What it is designed to change
The migration would proceed in steps that each have an owner and a rollback path, scheduled so that no cutover falls during year-end. We would track the number of unexplained reconciliation differences in each group at sign-off, where none are allowed to remain, and the legacy capacity released after each cutover.
Cross-industry
A cloud warehouse that costs more than its predecessor
The situation
A mid-size subscription business moved its warehouse to the cloud by copying the schemas and jobs across unchanged, and spend has risen in every quarter since. Analysts complain that dashboards are slow at the start of each week, and finance has no means of attributing the bill to a team or a product line.
What we would build
We would tag compute by team and pipeline, and then rank the queries and jobs by cost using the platform's own usage views. The work would concentrate on the most expensive items in that ranking. It would involve clustering large fact tables on the columns that filters use, replacing full reloads with incremental builds, separating dashboard compute from batch compute, and suspending compute that sits idle.
What it is designed to change
Finance would be able to attribute spend to teams and pipelines, and the largest costs would be removed at their cause, which a budget cap alone would not do. Progress would be measured by cost per team and per pipeline from month to month, together with dashboard query time at the weekly peak.
Technologies
We work in your stack and recommend on fit. We resell nothing.
Cloud warehouses and lakehouses
Snowflake · Google BigQuery · Databricks · Amazon Redshift · Microsoft Fabric · Azure Synapse Analytics
Each table group is cut over separately, after a period of parallel running and a sign-off from its owner. If something goes wrong, the problem is confined to one subject area and the cutover can be reversed.
Numbers that match, with evidence
Each migrated table comes with a reconciliation record showing that it agreed with the legacy source at cutover, and that record is usually the first thing finance and audit ask to see.
A smaller estate than you started with
Because unused tables, jobs and reports are retired and never moved, the migration is shorter and the new platform holds fewer objects that have to be run, secured and paid for.
A bill you can explain
Spend is attributed to teams and pipelines from the first group onward and compute is sized to each workload, so when costs are discussed the conversation can be about specific queries.
What you hold at the end
A usage-based inventory with migrate, rebuild or retire per object
A target platform recommendation backed by trials on your queries
A migration plan sequenced by table group, with owners
Reconciliation reports signed by each table group owner
Migrated pipelines and models in your repository, with tests
A cost view by team and pipeline, with budget alerts
A decommissioning record for every retired legacy object
Questions buyers ask
The answer depends on the mix of workloads and on the team that will run the platform. A cloud warehouse is simpler to operate when the work is mostly SQL reporting by analysts. A lakehouse on open table formats is the better fit if you also have large volumes of semi-structured or unstructured data, data science workloads, or a need to query the same files from several engines. The two kinds of product have converged a good deal, so we decide on trials with your own queries and give little weight to the category label.
The duration depends on how many live objects remain once the unused ones have been removed, on how much procedural code there is, and on how quickly table owners can review the reconciliation results. A two-week review produces the inventory and a sequenced plan, and a first table group can be running in parallel within a build of about twelve weeks. We give a schedule for the remaining groups after that, because the first group shows how much conversion and reconciliation effort your platform really takes.
Most of it can, although the risk is concentrated in the part that cannot. Conversion tools translate standard queries and table definitions well, whereas stored procedures, vendor-specific functions and legacy ETL jobs convert only in part and need some rewriting by hand. Even a clean translation can return different results, because platforms differ in how they handle nulls, rounding, collation and time zones. For that reason we reconcile the data and do not rely on the conversion report, and we treat a query as correct once its output matches the legacy output.
It can cost less, but that does not happen without some engineering. Cloud platforms charge for what runs, so a workload that is moved unchanged often costs more than expected. The savings come from retiring unused objects, sizing compute for each workload, suspending it when idle and fixing the few queries that account for most of the spend. We model cost on your real queries during platform selection and report the actual spend for each group as it migrates, which lets you check the business case early in the program.
Reports and downstream systems move together with the tables they read. For each group we list every consumer, which includes dashboards, extracts, feeds to other systems and analyst queries. The consumers stay on the legacy platform during parallel running and are repointed together at cutover, and the legacy objects remain readable for an agreed period as a fallback. We switch a legacy object off only after its last consumer has been confirmed as moved.