Technology consulting

Technology modernization

A decided fate for every system, and a funded order in which to carry it out.

How we do it

Overview

Systems in an estate age at different rates. One may run on a database version that leaves vendor support next year, another may work well although only two people understand it, and a third may still be running five years after its replacement went live because one report and one interface were never moved. Taken individually, each has a plausible case for modernization, but together there is rarely enough money, staff or tolerance for change to do them all, and several depend on each other in ways that no single project plan shows.

At the level of the portfolio, modernization starts as a series of decisions before any engineering begins. For each system someone has to decide whether to retire it, replace it with a package, move it to a new platform largely unchanged, rework it, or deliberately leave it as it is. The difficulty lies in making those decisions on evidence that is comparable from one system to the next, and then ordering them so that they respect dependencies, support deadlines and how many cutovers the business can absorb in succession.

We build that program. Each system receives a disposition with a stated reason and a named owner, and the sequence is laid out in waves that each carry their own funding, risk and exit test. We do not regard modernization as a goal in itself, because a system that is old, stable, cheap to run and rarely changed is often best kept, and when that is the case we say so. The engineering for each system is then carried out as a separate piece of work within a plan that holds together.

Challenges we address

The failures we are usually called in to fix
  1. Modernizing whichever system shouts loudest

    The order of work tends to follow the most recent outage or the most persistent sponsor. A system with a firm support deadline can end up waiting behind one that merely irritates its users, so the deadline arrives with no plan in place and an expensive extended-support contract.

  2. Retired systems that never switch off

    The replacement went live years ago, yet the old system keeps running for the sake of one regulatory report, one interface and an archive whose retention was never agreed. The organization pays for both systems, and the savings promised in the business case do not materialize.

  3. One treatment applied to everything

    Some programs declare that everything will move to the cloud, become a package or be rewritten. As a result, systems that should have been retired are carefully migrated, while systems that needed rework are moved across unchanged and keep all of their existing problems.

  4. Dependencies discovered at cutover

    The warehouse system is due to be replaced in spring, but during testing the team discovers that the finance system reads its tables directly and that four other applications rely on a nightly file it produces. The wave slips, and every wave queued behind it slips too.

  5. Funding that runs out before the core systems

    The budget was approved as one capital request based on optimistic estimates, and it covers the first and easiest systems. The difficult core, the period of parallel running and the decommissioning are left to a later request that has to compete with every other demand.

Our approach

How the work runs, in order
  1. Inventory the estate from evidence

    We compile a single list of systems from deployment records, contracts, invoices, integration configurations and interviews, because the asset register alone is rarely complete. For each system we record what it does, who owns it, what it costs to run, which other systems it connects to and how often it changes.

  2. Assess each system the same way

    Each system is scored against the same short set of questions covering business fit, technical health, support dates, run cost, rate of change and the risk that sits with the people and skills behind it. Using one scale across the whole estate is what allows one system to be compared fairly with another.

  3. Assign a disposition

    Every system is given one of a small number of decisions, which are retire, replace, replatform, rework or keep. Each decision comes with a written reason, a business owner who has agreed to it and a rough estimate of cost and duration, and a keep decision carries a review date so that it is recorded as a choice.

  4. Sequence into funded waves

    We order the work by dependencies, support deadlines, risk and the number of cutovers each business unit can handle in a year. Every wave has a budget that covers parallel running and decommissioning as well as the migration, together with a set of entry conditions and a test that marks its completion.

  5. Set up governance and start

    We define how the program will be run, including who may change a disposition, how each wave is reviewed and how savings are confirmed once a system has been switched off. The first wave then begins, usually with retirements, since they release money and shrink the number of interfaces every later wave has to deal with.

Technical capabilities

What we design, build and operate
  • Estate inventory

    One list of applications, databases, platforms and interfaces, built from evidence and reconciled against contracts and invoices, showing the owner, run cost, support dates and usage of each.

  • System health assessment

    Each system is scored in the same way for technical condition, supportability, security exposure and skills risk, and the evidence behind every score is recorded alongside it.

  • Disposition decisions

    For each system, a decision to retire, replace, replatform, rework or keep it, recorded with the reasoning, the business owner's agreement and a date on which it will be reviewed.

  • Dependency mapping

    We map the interfaces, shared databases, batch files and reporting feeds between systems from configuration and traffic data, so that undocumented links come to light before a wave is planned.

  • Wave planning

    We lay out a sequence of modernization waves whose size matches the delivery capacity available and the amount of change each part of the business is able to absorb.

  • Funding and business case modeling

    We model the cost of each wave, including migration, parallel running, data archiving and decommissioning, and we tie the expected run-cost savings to the date on which a system is actually switched off.

  • Decommissioning plans

    For every system that is leaving the estate, a plan covering data retention and archiving, removal of interfaces, contract termination dates and a final shutdown step with a named owner.

  • Program risk management

    We keep a risk register for the whole estate that covers support deadlines, reliance on key people, cutovers that overlap and vendor timelines, and we review it at the boundary of every wave.

Where it applies

Business applications
  • Several support deadlines at once

    Operating systems, databases or packaged applications that will leave vendor support within a few years, in numbers too large to deal with one at a time.

  • After mergers and acquisitions

    Two or more overlapping estates in which every function has duplicate systems, so that someone has to decide which of each pair will survive.

  • A data center exit

    A fixed date for leaving a facility, which forces a decision about every system housed there and a migration order that works as a whole.

  • Run cost that leaves nothing for change

    A budget that is used up by keeping old systems running, where retiring and consolidating systems is the only realistic way to free money for new work.

  • A stalled modernization program

    A program that has modernized the easy systems and run short of money, and now has to tackle the core without any agreed order for the remaining work.

  • Skills leaving the organization

    Systems that rely on a few people who are close to retirement, so that the order of work has to follow the people as much as the technology.

In practice

Two situations this service is built for, and what we would do in each.

Insurance

An insurer with two estates after an acquisition

The situation
Having acquired a smaller competitor, a regional insurer now runs two policy systems, two claims systems, two finance ledgers and a long tail of supporting applications, and each side argues for keeping its own. The integration budget assumed savings from consolidation, yet no one has set out which systems will go, in what order, or what each retirement involves.
What we would build
We would compile one inventory across both estates and assess every system on the same scale, taking run costs and support dates from the contracts. Each overlapping pair would receive a disposition agreed with a business owner, and the order would follow the dependencies, so the ledgers would move before the claims systems that post to them. Every wave would include its migration, parallel-run and decommissioning costs, with savings dated to each shutdown.
What it is designed to change
The insurer would have a single plan in which every system has a decided fate and a date. Progress would be tracked by the number of systems actually switched off compared with the plan, and by the run cost released at each shutdown, as confirmed by finance.
Public sector

A public agency facing a run of support deadlines

The situation
A public agency runs its business applications on versions of databases and operating systems that will leave vendor support over the next few years. Its funding arrives as annual allocations, earlier bids for one large modernization program were turned down, and the technology team has been upgrading whichever system the auditors mentioned last.
What we would build
We would list every system along with its support dates, usage and run cost, and identify those that can be retired outright. The remaining systems would be grouped into waves that each fit within an annual budget, ordered by support deadline and by dependency. Every wave would be written as a funding request that stands on its own and delivers its own result, so approval in one year does not depend on the next.
What it is designed to change
Each annual allocation would pay for a completed wave rather than a fraction of a larger program. We would track the number of systems still running on unsupported versions at the end of each year and the number of deadlines met without an extended-support contract.

Technologies

We work in your stack and recommend on fit. We resell nothing.
Portfolio and architecture tools
LeanIX · Ardoq · ServiceNow CMDB · ArchiMate models · spreadsheets where they are enough
Discovery and dependency analysis
Azure Migrate · AWS Application Discovery Service · network flow analysis · database query logs · integration platform configurations
Estates commonly assessed
SAP · Oracle E-Business Suite · Microsoft Dynamics · IBM mainframe and midrange · custom Java and .NET applications · legacy databases
Target platforms
AWS · Microsoft Azure · Google Cloud · private cloud and on-premises · SaaS packages

Business outcomes

What changes for the organization
  • Every system has a decided fate

    Each application is either being retired, replaced, replatformed or reworked, or has been deliberately kept, and in every case an owner has agreed to the decision, so none is left in an undefined state.

  • Old systems actually switch off

    Because decommissioning is planned and funded within each wave, the organization stops paying to run the old system and its replacement side by side.

  • Support deadlines met with a plan

    Systems that are approaching the end of support are dealt with in order and ahead of the date, which avoids emergency upgrades and extended-support fees.

  • Funding matched to the sequence

    Finance can see what each wave will cost and what it will release, and can approve the program in stages that each make sense on their own.

What you hold at the end

  • An estate inventory reconciled against contracts and invoices
  • A health assessment for every system on one scale
  • A disposition per system with reason and business owner
  • A dependency map of interfaces, shared data and batch feeds
  • A wave plan with entry conditions and exit tests
  • A funding model per wave, including decommissioning
  • A program governance guide and estate-level risk register

Questions buyers ask

Application modernization is the engineering work on a single system, which means reading its code, replacing it piece by piece and migrating its data. This service sits a level above. It decides which systems justify that engineering in the first place, which should be retired or replaced with a package, and in what order the work should happen across the estate. Application modernization produces working software, while this service produces the plan, the funding and the governance within which many such efforts run.

No, because a first pass on a few questions sorts most of the estate quickly into systems that are unused, systems that are healthy and stable, and systems with an obvious deadline. We keep the detailed assessment for the minority where the decision is close or a wrong call would be expensive. The aim is a disposition you can defend for every system, and for most of them that needs only a short conversation and a few facts.

When the system is stable, cheap to run, rarely changed, still supported and not holding anything else back. Age on its own is no reason to modernize. Even so, a decision to keep a system should be written down with a review date and the conditions that would reopen it, for example a support notice, the departure of the people who understand it, or a new business need that it cannot meet.

We use four factors, roughly in this order. Hard deadlines such as the end of support or a facility exit come first, and dependencies then determine what has to move before what. Retirements are scheduled early because they release money and remove interfaces. Finally we check the plan against capacity, meaning how many cutovers each business unit can absorb in a year and how many your delivery teams can run at the same time.

That depends on how your organization approves spending, although a single large request backed by one business case is the weakest option. We structure the program as waves that each have their own cost, result and exit test, so that it can be approved, and stopped if necessary, in stages. Every wave includes parallel running and decommissioning, and savings are counted from the date a system is switched off, once finance has confirmed them.

Discuss technology modernization with the people who would do the work.

Tell us what you are trying to do and where it is stuck. A principal reads every message and replies within one working day.

How we engage

Start a conversation.

A short paragraph is enough. A principal reads every message and replies within one working day.

Or email hello@farside.works. We use what you send only to reply. Privacy