A migration seldom goes wrong on the day of the move itself, and the trouble usually appears in the months before and after it. An undocumented dependency breaks a batch job two days after cutover, or an application that was fast in testing turns slow in production because its database stayed behind and every query now crosses a network link. The early waves tend to go smoothly while the last few systems prove awkward, and two years on the organization is still paying for the cloud and the data center at the same time.
We move one workload at a time, and each workload has its own plan covering what it depends on, how its data is copied and kept in sync, how the switch is made, how we confirm it worked and how we return if it did not. The rollback is rehearsed before the cutover, because a rollback that exists only on paper cannot be relied on. It also has an expiry, since once the new system has accepted writes the old one never saw, going back means losing that data or replaying it, and the plan states exactly when that point is reached.
From the first workload onward, infrastructure is written as code. An environment assembled by clicking through a console cannot be reviewed, rebuilt or copied for testing, so it turns into the next legacy estate running on newer hardware. The work finishes with decommissioning, which means servers wiped and removed, licenses and contracts ended and the facility handed back, and until that has happened the savings promised in the business case remain a forecast.