Energy and utilities

Networks designed for power flowing one way now carry it both ways

We engineer the data and integration between operational systems and the business, with the caution a control room expects from outsiders.

Relevant capabilities

Overview

A utility runs physical assets that last for decades and have to work around the clock, and its operational technology is built accordingly. The control room has SCADA and distribution or energy management systems, substations have protection relays and remote terminal units, and historians record every measurement. Alongside these sit the business systems for asset management, geographic information, outages, meter data and customer billing. Each was specified on its own, so each holds its own model of the same network.

Meanwhile the network is changing faster than those systems can follow. Rooftop solar and batteries make customers into generators, while electric vehicle charging and heat pumps shift load to new places and new times of day. Smart meters now produce interval readings where there used to be a few manual reads each year. As a result, operators need visibility of a low-voltage network they never had to monitor before, and planners need forecasts for each feeder where a regional figure used to be enough.

Engineering work here carries constraints that office IT does not face. A wrong command can cut power to a hospital or put a line crew in danger, regulators examine spending and reliability closely, and security rules for control systems limit what may connect to what. We work on the data and integration side of that boundary, supporting your operations engineers, and we stay out of protection, control logic and switching. The same approach applies to water and gas networks, where pumping stations and pressure zones play the part that feeders play in electricity.

Industry challenges

The forces on technology leaders
  1. Distributed energy arriving faster than network visibility

    Connection requests for solar, storage and chargers are piling up, and planners have to assess each one against network models that are out of date at low voltage. In many cases the utility cannot say for certain which transformer a given customer is connected to.

  2. Meter data outgrowing systems built for billing

    Smart meters deliver interval data in volumes that the meter data and billing systems were only ever sized to bill from. Network planning, loss analysis and customer programs all want the same readings, and each of those teams usually ends up building its own extract.

  3. Aging assets and a fixed budget to replace them

    Transformers, cables, pipes and poles are reaching the end of their design lives at around the same time, while replacement budgets are set through regulatory review. The utility has to justify replacing one asset before another, often with condition data that is incomplete or still held on paper.

  4. Security obligations that keep tightening

    Because control systems are a target, regulators have introduced mandatory security requirements for critical infrastructure. Every new data flow leaving the operational network has to be justified, documented and monitored, and older field devices often cannot be patched at all.

  5. Field crews working from disconnected systems

    A crew typically gets a work order from one system, looks the asset up in another, confirms switching status by phone and records the job on paper. Asset records are then updated weeks later, if at all, which means the next crew starts out with wrong information.

Transformation opportunities

Where technology changes the result
  • A network model that matches the field

    Reconciling the geographic information system, the asset register and meter data to correct which customer is connected to which transformer and phase. Voltage and outage patterns from meters expose connectivity errors that would take a field survey years to find.

  • Load and generation forecasts at feeder level

    Forecasts built from interval meter data, weather and the known solar and charger installations, at the level of detail planners and operators work at. They inform connection assessments and switching plans, and show where flexibility might defer network reinforcement.

  • Asset replacement ranked by condition and consequence

    Combining inspection results, maintenance history, loading and failure records into a health score for each asset, shown next to the consequence of that asset failing. Investment plans can then be defended to the regulator asset by asset, with the data behind every ranking available.

  • Outage communication driven by real events

    Joining last-gasp signals from meters, SCADA alarms and customer calls so that the outage system sees how far a fault extends sooner and customers receive an accurate status without having to call. Restoration is confirmed when meters come back online, rather than assumed from a closed work order.

  • Field work with the asset record in hand

    Mobile tools that work offline and give a crew the work order, asset history, network diagram and safety documents in one place, and that record what was done at the asset. That update reaches the asset management system on the same day.

Relevant capabilities

The services that matter most here, and why

What shapes the engineering

Regulatory, data and operational constraints
  1. Control systems are isolated by design and by rule

    Security regimes for critical infrastructure, such as the NERC CIP standards in North America and the NIS2 directive in the European Union, impose obligations for protecting the systems that run the network. We keep analytics outside the control network, move data outward only through approved boundaries, and document every flow for your compliance team.

  2. Nothing we build issues a switching command

    Operating the network is the responsibility of trained and authorized operators who use control room systems and follow safety procedures. Our software advises, forecasts and reports, and any proposal for analytics to act on the network itself would be a matter for your operations and protection engineers to decide.

  3. Meter data is personal data

    Interval consumption readings can show when a household is at home and how it lives, and in many jurisdictions privacy law treats them as personal data. We separate identity from consumption at an early stage, aggregate wherever the purpose allows, and limit access to identified data by role.

  4. Regulated figures must be reproducible

    Reliability indices, settlement volumes and investment justifications go to regulators and market operators and may be audited later. The pipelines that produce them therefore need versioned logic, lineage back to the source readings, and the ability to rerun a past period and arrive at the same answer.

In practice

Three situations from this industry, and what we would do in each.

Solar connections queued behind an uncertain network model

The situation
A distribution utility is receiving more rooftop solar applications than its planners can assess, and each study depends on knowing which transformer and phase the customer is connected to. That mapping is held in the geographic information system, but field changes over the years were not always recorded, so planners add wide safety margins to make up for the uncertainty.
What we would build
We would compare voltage profiles from smart meters to work out which meters share a transformer and phase, and flag the cases where this inference disagrees with the recorded connectivity. Network engineers would confirm the flagged cases, and confirmed corrections would go back into the geographic system through its normal update process. We would first test the method on an area that had a recent field survey.
What it is designed to change
Planners would assess applications against a model they have good reason to trust. We would track the rate of connectivity errors found in field checks of corrected areas and the time a standard application spends in assessment.

Estimated bills caused by gaps in meter data

The situation
An energy retailer bills from interval data supplied by several network operators. When files arrive late or incomplete, the billing system estimates the missing periods and customers later receive corrections, so complaint volumes rise and the finance team is unable to reconcile billed volumes with those used in market settlement.
What we would build
We would place a validation layer in front of billing that checks each delivery for completeness, duplicates and implausible values, applies the estimation rules the market allows, and marks every interval that has been estimated. Data that arrives late would replace the estimates through a controlled rebilling process, and a daily reconciliation would compare billed and settled volumes by network area and report any differences.
What it is designed to change
Estimated bills would become the exception, and each one could be traced to a particular missing delivery. Progress would be judged on the proportion of invoices issued on estimated data and on the unexplained gap between billed and settled volumes.

A water utility's pumps maintained by the calendar

The situation
A water utility services its pumps at fixed intervals whatever their condition. SCADA collects telemetry on pressure, flow, motor current and run hours and stores it in a historian that only control room staff use. Pumps still fail between services, while some are overhauled when they are in good health.
What we would build
We would replicate the relevant historian tags to an analytics store outside the control network, join them with work orders from the asset management system, and build indicators that show declining efficiency against each pump's own performance curve. Alerts would become proposed work requests for a maintenance planner to accept or reject, and every rejection would be recorded and used to improve the indicator.
What it is designed to change
Maintenance effort would shift toward the pumps that show signs of wear. We would measure the share of pump failures that had been preceded by an accepted alert, along with the number of overhauls carried out on pumps whose indicators were healthy.

Business outcomes

What the work is meant to change
  • One network model used by everyone

    Planning, operations, outage management and field crews all work from connectivity and asset data that agree with each other, so studies and switching plans begin from the network as it was actually built.

  • Investment plans that withstand regulatory review

    Every replacement decision is supported by condition and consequence data with lineage back to its source, which gives the regulator evidence in place of the engineering assertion it used to receive.

  • Meter data that serves more than billing

    Validated interval data reaches planning, loss analysis and customer programs from one governed source, and privacy controls are applied once at that source, which spares each team from repeating them in its own extract.

  • Operational data shared without weakening control

    Analysts and planners receive the measurements they need through outbound flows that are documented and monitored, while the control network remains exactly as isolated as it was before.

Questions leaders ask

We do not need direct access. We ask your operations team to publish the data we need to a point outside the control network, such as a replicated historian or the receiving side of a data diode, and we work from there. We hold no credentials for control systems and nothing we build is able to write to them. Your security and compliance staff approve the design of each data flow before any work starts.

We keep the first commitment small and the evidence clear. A two-week review at a fixed fee produces a written assessment and a ranked plan that you can use in an investment case. A build takes one use case to production in about twelve weeks against tests agreed at the outset, which means the benefit has been demonstrated before anyone proposes a larger program. We record decisions in a log that your regulatory team can cite.

Yes, and it has to, because utility systems are replaced on long cycles. We integrate with what is in place, whether that is file exports from an old customer system, a historian interface or the change feed of a geographic system. When a system supports the Common Information Model we use it, and when it does not, we map to a shared model in the integration layer and keep that mapping documented for the day the system is eventually replaced.

The method carries across all three, which is to get telemetry out of the operational network safely, join it to asset and work records, and build forecasting, maintenance and reporting on that foundation. The domain details differ, such as pressure zones and leakage in water or pipeline integrity in gas, and on those we rely on your engineers. What we bring is data and software engineering, without any claim to network engineering, and we make that clear from the start.

In practice

An engagement from this industry

Other industries

Tell us what you are trying to change and we will tell you what it would involve.

Tell us what you are trying to do and where it is stuck. A principal reads every message and replies within one working day.

All services

Start a conversation.

A short paragraph is enough. A principal reads every message and replies within one working day.

Or email hello@farside.works. We use what you send only to reply. Privacy