Engagement · Energy and utilities

An event-driven platform that keeps customers informed during outages at an electric utility

An electric distribution utility tells each affected customer what it knows about an outage, using one stream of events to feed every channel.

The situation

An electric distribution utility serves a mix of urban and rural customers. Its outage management system tracks incidents, uses customer calls and smart meter signals to predict which device has operated, and records crew assignments and estimated restoration times, while the customer information system holds accounts, premises and contact details and the geographic information system holds the network model. Customers currently learn about outages from an outage map on the website, a recorded phone message and, if they have signed up, text alerts that a separate batch tool sends.

That arrangement is workable on an ordinary day, but during a storm it breaks down at the point where customers most need information. The map refreshes on a slow schedule while the phone lines saturate and texts arrive late or twice, so customers who cannot find out what is happening call again and add to the load. After each major event the regulator asks how customers were kept informed. The utility wants its communication to be driven by the same events its operators see, and to keep working under the heaviest load it is likely to face.

What was going wrong

  1. Each channel tells a different story

    The map, the phone message and the text alerts are each fed by a separate extract that runs on its own schedule. As a result, a customer can see power restored on the map, hear an old estimate on the phone and then receive a text about a new outage.

  2. Storm load arrives all at once

    During a major storm, outage events arrive in bursts far above the daily norm, and operators merge, split and re-predict incidents as they learn more. A pipeline sized for a normal day falls behind at the moment when the largest number of customers are waiting for news.

  3. Restoration estimates that erode trust

    An automatically generated estimate is often sent as a firm time and then revised three times, although customers make plans around the first one. In a large event a default estimate may mean very little, and sending it can do more harm than telling customers that no estimate is available yet.

  4. Restored on paper, still dark

    When a feeder is re-energized the incident is closed and customers are told their power is back. A household behind a second fault on the same line, which is still without power, receives the all-clear anyway and has to call to report the outage again.

Our approach

In order
  1. Map events and their meaning

    We would go through the outage lifecycle with control room and customer operations staff, covering incident created, customers predicted affected, crew dispatched, crew on site, estimate set or changed, partial restoration, restored, and incident merged or cancelled. For each of these events we agree what a customer should be told, if anything at all.

  2. Decide the message policy

    Customer operations writes down the rules, which cover the events that trigger a message, how often one customer may be contacted, whether an estimate appears as a time, as a window or as not yet available, and what changes during a declared major event. These rules are held as configuration, so customer operations can change them without a software release.

  3. Keep the event path outside control systems

    Outage events are published from the outage management system, through its supported interface, into a platform that runs in the business network or the cloud. The flow runs in one direction only, and the system we build sends no commands toward the control room systems or the network.

  4. Test with a replayed storm

    We replay the event logs from a past major storm at real speed and at higher speeds, checking throughput and message delay as well as duplicate suppression, along with the platform's behavior when a channel provider slows down or incidents merge while messages are in flight. The test is repeated before every storm season.

  5. Roll out by channel and region

    The outage map moves to the new event stream first, followed by text and email for one operating region and then by the phone system. Each step runs alongside the old feed until the two have been compared across real outages.

The design

The parts and what each one does
  • Outage event stream

    Events from the outage management system, together with meter power-off and power-restore signals from the metering head-end, are published to a durable log with a schema for each event type, partitioned so that events for one incident stay in order.

  • Customer impact service

    The service uses the network model to resolve each incident to the affected premises, adds contact details and preferences from the customer information system, and keeps a current state for each premise of out, restored or unconfirmed.

  • Notification workflow

    A durable workflow for each customer and incident applies the message policy and suppresses duplicates, and it waits for rapid changes to settle before sending anything. It also survives restarts without resending messages that have already gone out.

  • Channel adapters

    Separate adapters handle text, email, outbound voice, the phone system's recorded messages and the web map, each with its own rate limits, retries and delivery receipts and with a fallback for when a provider is slow.

  • Restoration verification

    Once an incident closes, meter restore signals are checked premise by premise, and where a meter has not reported back the customer is asked to confirm whether power has returned.

  • Operations console

    Customer operations staff get a view of messages sent by incident, queue depths, delivery failures and the current policy mode, along with a control that pauses automated messaging for a given incident.

Safeguards

What keeps a bad day small
  • One-way and advisory

    The platform reads outage events and has no ability to issue switching or dispatch instructions. If it fails completely, the crews, the control room and its outage management system carry on working exactly as they did before.

  • Priority customers handled by people

    Customers registered as medically dependent on electricity are flagged on the affected list so that the utility's own outreach procedure can reach them. Automated messages add to that personal contact and are never a substitute for it.

  • Consent and contact limits

    Messages are sent only to customers who opted in for that channel, and opt-outs take effect immediately. A cap on messages per customer stops an incident that keeps opening and closing from producing a stream of texts.

  • A major event mode

    When operations declares a major event, individual estimates give way to area-level updates approved by a named person, and the rules on message frequency change. Switching into this mode is a rehearsed step in the runbook.

Timeline

  1. Weeks 1 to 2

    We map the lifecycle with control room and customer operations, draft the message policy, review interfaces and network boundaries with security, and obtain storm event logs for replay.

  2. Weeks 3 to 6

    We build the event stream, the customer impact service and the notification workflow, and storm replay tests begin on staging and run every week from then on.

  3. Weeks 7 to 9

    The channel adapters, restoration verification and the operations console are built, and the outage map runs on the new stream alongside the old feed.

  4. Weeks 10 to 12

    Text and email go live for one operating region and major event mode is rehearsed with customer operations, after which the runbooks and on-call duties are handed over.

What it changes

What the build is designed to change

A customer who loses power is told that the utility is aware of it, how far the response has progressed and what estimate exists, in wording that matches the map and the phone message because all three are generated from the same event. Estimates are presented with the level of confidence they actually carry, and a household that may still be without power after a restoration is asked to confirm, where previously it would have been told the problem was fixed. Customers who are kept informed have less reason to call, leaving the phone lines for people reporting hazards.

For the utility, a storm becomes a load that the platform has already been tested against using the utility's own history. Customer operations can see what was sent, to whom and when, and can produce that record for the regulator after a major event. The measures below are how the platform would be assessed after each major outage.

How success is measured

  • Delay between an outage event and the customer message, on normal days and storm days
  • Duplicate or contradictory messages per incident across all channels
  • Call volume per affected customer during comparable outages
  • Restoration messages later contradicted by a customer report or a meter signal
  • Throughput and delay achieved in each season's storm replay test

What generalizes

  1. Capacity is sized for storms

    The platform is close to idle most of the time and is judged on a few days a year. Sizing, back-pressure and message policy therefore have to be decided against a replayed major event, since no one can stage a real storm when a rehearsal is needed.

  2. Stated uncertainty serves customers better

    Telling customers that crews are assessing the damage and that no time is available yet is more useful to them than a default estimate that will later be revised. When to show a time is a decision for customer operations, and the software enforces whatever policy they set.

  3. One event source for every channel

    Inconsistent messages usually come from separate feeds, and changing the wording does little to fix them. Once the map, the phone system and the alerts consume the same stream and the same customer state, any disagreement between them is short-lived.

All engagements

If you have a similar problem, a two-week review is the usual place to start.

Tell us what you are trying to do and where it is stuck. A principal reads every message and replies within one working day.

How we engage

Start a conversation.

A short paragraph is enough. A principal reads every message and replies within one working day.

Or email hello@farside.works. We use what you send only to reply. Privacy