Technology consulting

Enterprise technology consulting

One difficult technology decision worked through to a recommendation and a first step.

How we do it

Overview

Some technology problems do not belong to any one team. Take slow order processing, where the cause could lie in the ERP configuration, in the integration layer, in the way three departments hand work to each other, or in a supplier contract that makes every change expensive. When specialists are asked to look, each tends to find the problem in their own field, so the architect proposes a new platform, the delivery lead asks for more people and the vendor recommends an upgrade. All three may be partly right, and the organization is still left without a decision.

Problems of this kind sit between strategy, architecture and delivery. They are difficult because the evidence is split across code, contracts, budgets and what individual people remember, and because whoever frames the question usually shapes the answer as well. A large consulting team tends to respond with a long discovery phase and a recommendation sized to the staff it has available, while an internal team knows the systems well but carries the history of every earlier attempt.

We work on one decision or one problem at a time, in a small team led by a principal who does the work personally. The diagnosis is based on evidence, and from it we set out the options that are open to you, including the option of changing nothing, with the cost of each in money, time and risk. We then recommend one of them and name who has to do what in the first weeks. Because we resell no software, the answer is free to be that you already own what you need.

Challenges we address

The failures we are usually called in to fix
  1. A symptom mistaken for the problem

    The brief says the platform is too slow, so every proposal that comes back is about platforms. Unless someone has checked whether the delay sits in the software, in an approval step or in a nightly job that predates everyone now on the team, the money is likely to be spent on the wrong fix.

  2. Every specialist finds their own answer

    The architecture team sees an architecture problem, the delivery office sees a governance problem and the vendor sees a licensing problem. Each analysis is competent as far as it goes, but because weighing them against each other is not part of anyone's brief, leadership receives three recommendations that cannot all be funded.

  3. Options that are really one option

    The decision paper lists three choices, although two of them were written to be rejected. The costing of the preferred choice leaves out migration, parallel running and the people needed to operate the result, so the steering group ends up approving a decision without having been offered a real alternative.

  4. A recommendation that cannot be acted on

    The report says to modernize the core, strengthen governance and invest in data, all of which may be correct. Because it names no owner, first step, order of work or cost, there is nothing in it to act on, and so it gets filed, with the same problem coming back at the next budget round.

  5. The decision that is never taken

    The question has been studied three times, and each study has ended in a request for more analysis, because choosing would mean that someone loses budget or a favored system. While the decision waits the old contract renews and the workaround keeps growing, and the cost of the delay is not recorded anywhere.

Our approach

How the work runs, in order
  1. Agree the decision and its owner

    We start with the person who has to decide and write the question down in one paragraph, covering what is being chosen, by when, within what budget and constraints, and what would count as a good result. If it turns out that the decision has no owner, finding one becomes the first piece of work.

  2. Diagnose from evidence

    A principal and a senior engineer read the material that already exists, which usually means code and configuration, architecture documents, incident records, contracts, budgets and delivery plans. We also talk to the people who run and use the systems. In the write-up we keep what has been measured apart from what is being assumed, and label each accordingly.

  3. Set out real options

    We describe three or four options that a reasonable person could choose, and one of them is always the option in which little changes. For each we give the cost to build and to run, the time it takes, what it depends on, what could go wrong and whether your team could operate the result.

  4. Recommend and say why

    We pick one option and put the reasoning in writing, including the evidence that would make us change our mind. The decision paper is kept short enough to be read before the meeting, and we present it both to the people who will decide and to those who are likely to object.

  5. Turn it into a first move

    The recommendation ends in a 90-day plan that sets out named owners, the first three pieces of work, the decisions that are still open and the checkpoints at which to stop or continue. The plan is written so that you can run it with your own people, with another supplier or with us.

Technical capabilities

What we design, build and operate
  • Problem framing

    A written statement of the decision, its owner, its deadline and its constraints. We agree it before any analysis starts, so that the work answers the question the decision owner is asking.

  • Cross-discipline diagnosis

    One team reads strategy, architecture, code, contracts and delivery practice together, which makes it less likely that a cause sitting between two functions is missed by both.

  • Options analysis

    Options described in comparable terms, with build cost, run cost, duration, dependencies and risk set side by side, and with the cost of doing nothing for another year included.

  • Decision papers

    A short paper for the executive or board that has to decide, covering the question, the evidence, the options, the recommendation and what approving it commits them to.

  • Architecture and feasibility checks

    A quick technical test of the claims that an option rests on, for example a volume estimate, a trial of an integration or a close reading of a vendor's actual limits.

  • Cost and effort modeling

    Estimates built from your own run costs, contract terms and team capacity. The assumptions are listed alongside the figures so that finance can challenge each one.

  • Stakeholder alignment

    Structured sessions with the functions that disagree, in which each position is tested against the same evidence. Whatever disagreement remains is written down for the decision owner.

  • Mobilization planning

    A plan for the first ninety days after the decision, covering owners, sequence, the skills needed, the supplier steps and the checkpoints at which the plan is reviewed.

Where it applies

Business applications
  • A problem with no obvious owner

    A recurring failure, cost or delay that crosses departments and systems, where each team has its own explanation but none of them has the authority to fix it.

  • Extend, replace or build around

    A choice between extending a system, replacing it or building around it, in cases where the answer will shape several years of budget.

  • A new mandate from the board

    A leadership instruction, such as cutting technology run cost or adopting AI, which has to be turned into specific decisions before anyone can act on it.

  • Reports that disagree with each other

    Two or three reports from vendors, integrators or internal teams that reach different conclusions, where leadership needs a single reasoned view.

  • A new technology leader's first quarter

    An incoming CIO or CTO who wants an independent reading of one inherited problem before committing to a position on it.

  • Deciding what kind of help is needed

    Working out whether the next step should be a strategy, an architecture, a rebuild or nothing at all, before you commission any of them.

In practice

Two situations this service is built for, and what we would do in each.

Manufacturing

A manufacturer that cannot promise a delivery date

The situation
The sales team at a mid-size manufacturer cannot give customers a reliable delivery date. The ERP vendor proposes an upgrade, the planning team wants a scheduling product and IT wants to rebuild the integrations with the plants, and each proposal has a sponsor and a budget request behind it. The chief operating officer has to choose between them before the planning cycle closes.
What we would build
We would trace a sample of recent orders from quote to shipment, through the ERP, the plant systems and the spreadsheets between them, recording where each date was set and where it went wrong. That shows which of the three proposals addresses the actual cause. Each option would then be costed, including a smaller one that none of the sponsors proposed, and the recommendation would come with a first step for the following month.
What it is designed to change
The operating officer would be choosing with the cause in view and would not have to rely on the relative strength of three pitches. We would track the gap between promised and actual delivery dates on new orders, starting from the baseline taken during the diagnosis.
Professional services

Project margins that arrive weeks after month-end

The situation
A professional services firm learns the margin on each project weeks after the month has closed. Finance blames late timesheets, delivery leaders blame the project accounting system, and IT has been asked to price a data warehouse. Two earlier studies recommended more analysis, and the managing partner now wants a decision this quarter on what to buy, if anything.
What we would build
We would follow the figures for a handful of projects from timesheet to margin report and time each step along the way. Alongside that we would read the configuration of the accounting system and the reports built on it, and sit with the people who prepare the numbers. The options might range from changing the timesheet deadline and two reports, through reconfiguring the existing system, to a new platform, and each would be costed before we recommend one.
What it is designed to change
The firm would commit to one course and stop funding the others. Success would be judged by the number of days between month-end and a margin figure that project leaders accept, compared with the baseline recorded at the start.

Technologies

We work in your stack and recommend on fit. We resell nothing.
Evidence we read
source code and configuration · architecture documents · incident and change records · contracts and license terms · budgets and run costs · delivery plans and backlogs
Analysis methods
value stream mapping · total cost of ownership models · architecture decision records · Wardley maps · risk registers
Modeling notations and tools
C4 model · ArchiMate · BPMN · Structurizr · draw.io
Estates commonly assessed
SAP · Oracle · Microsoft Dynamics 365 · Workday · ServiceNow · custom applications on AWS, Azure and Google Cloud

Business outcomes

What changes for the organization
  • A written decision with an owner

    A question that has been circulating for months ends in a written choice with a named owner, and the alternatives are formally closed so that they do not carry on as unofficial projects.

  • Money aimed at the cause

    Spending is directed at the part of the estate or the process where the problem starts. That part is often smaller and cheaper to fix than the first proposal assumed.

  • Options leadership can compare

    Executives see each choice on one page with its full cost, duration and risk, which puts them in a position to defend the decision to the board and to finance.

  • A start that does not wait

    The first ninety days are planned and have owners before we leave, so work on the decision can begin within weeks without waiting for the next planning cycle.

What you hold at the end

  • A one-paragraph statement of the decision and its owner
  • A written diagnosis that separates evidence from assumption
  • Three or four costed options, including changing little
  • A decision paper with one recommendation and its reasoning
  • A ranked list of risks to the chosen option
  • A 90-day plan with named owners and checkpoints

Questions buyers ask

The review answers a defined question about something that already exists, such as an architecture, a shortlist, a company you may buy or a program in trouble. This service starts earlier, at the stage where the question itself is unclear and the problem crosses strategy, architecture and delivery, so much of the work goes into framing the decision and building options that can be compared. The first two weeks of the two services can look alike, and we will tell you on the first call which one fits.

That depends on how much evidence has to be gathered and how many people have to agree. A contained decision for which the evidence is easy to reach fits the two-week review format at a fixed fee. A problem that spans several business units or needs a technical test of one of the options will take longer and may run as an embedded team on a month-to-month basis. In either case we agree the duration and the fee before starting, and we do not extend discovery to fill time.

Sometimes the recommended option involves engineering that we could do, and when that is the case we say so openly. The plan is written so that your own team or another supplier can carry it out, and it names the skills required without naming a firm. We resell no software and take no referral fees. If the right answer is to change a process and buy nothing, the paper will say that.

A named principal leads the engagement from the first call to the final presentation, and does the reading, the interviews and the writing together with a senior engineer. Specialists in data, cloud or a particular platform join for the parts that need them. The people you meet before the engagement are the people who do the work, so there is no handover to a junior team afterwards. We keep the team small by design, which also limits how much of your people's time we take up.

In that case we say so, and we say what would settle the matter. Usually the decision is close between two options and turns on one unknown, such as a volume, a vendor commitment or a team's capacity. We name that unknown, propose the cheapest test that would resolve it, and recommend which way to go if the test cannot be run in time. We would rather state the uncertainty in the paper than hide it, because a decision owner who is unaware of it cannot plan for it.

Discuss enterprise technology consulting with the people who would do the work.

Tell us what you are trying to do and where it is stuck. A principal reads every message and replies within one working day.

How we engage

Start a conversation.

A short paragraph is enough. A principal reads every message and replies within one working day.

Or email hello@farside.works. We use what you send only to reply. Privacy