Cloud strategies often begin as a slogan, such as cloud first or an instruction to leave the data center by a certain date, and a slogan stops being useful as soon as a workload does not fit it. A plant system that has to respond in milliseconds on the shop floor, a database licensed per physical core and a batch estate that runs at a steady load every night on servers that are already depreciated each need a separate answer. A strategy you can act on is therefore a list of workloads, with a destination, a reason and a price recorded against each one.
Pricing is where most cloud business cases go wrong, because a comparison of compute rates covers only a small part of the bill. Providers usually charge for data that leaves their network, licenses can carry different terms on rented hardware, and the result still has to be operated at night by people whose skills cost money wherever the systems run. The data center has costs that are easy to leave out as well, including the lease, power, hardware refresh and the staff who keep it running. We build the model from your own invoices and inventory so that finance can check it line by line.
Architecture follows from the placement decisions. Before the first workload arrives the foundation needs to be in place, which means deciding how accounts, subscriptions or projects are divided, how people and machines sign in, how networks connect to one another and to your existing sites, and which rules are enforced in code rather than written in a policy document. A landing zone built by hand for the first project tends to become the template for every later project, and its mistakes are copied along with it. For that reason we design it once, as code, for the whole estate you expect to run.