Technology consulting

We write strategy as decisions with owners and budgets

Independent advice on where to invest, what to stop and how to build, set out as decisions your teams can act on.

6 services in this practice

Our view

Technology consulting

Technology strategy most often fails in the months after it is presented. The steering group approves a direction and the deck is filed, but the portfolio carries on much as before, because nothing in the document said who decides, what gets funded first or which projects stop to make room. The analysis behind it was often sound, and what was missing was the part that is uncomfortable to write down, namely the order of the work, the money and the name of the person who owns each decision.

We write strategy and architecture as a set of decisions. Each one records what was chosen, what was rejected and why, who owns it, what it costs and what has to be true before the next step is funded. To reach those decisions we read material that a slide cannot show, including the code, the integration jobs, the contracts, the incident history and the actual cost of running each system, since that is usually where a roadmap comes apart.

Our advice is independent in a practical sense. We do not resell software and have no vendor to favor, so recommending that you keep what you have, or buy nothing at all, costs us nothing. We also state one limit at the start, which is that this work needs an executive who owns the trade-offs, because although we can rank the options and show the evidence, we cannot stop a project on your behalf.

Services

6 services, usually several on one engagement
  1. Enterprise technology consulting

    One difficult technology decision worked through to a recommendation and a first step.

    Problem framing · Cross-discipline diagnosis · Options analysis · Decision papers
  2. Digital transformation strategy

    A short, ordered list of funded investments and a second list of what stops.

    Portfolio inventory and triage · Value stream and process baselines · Initiative dependency mapping · Investment cases with gates
  3. Technology strategy and roadmaps

    A roadmap in which every item has an owner, a cost and a known funding status.

    Technology spend baseline · Application portfolio assessment · Build, buy or partner analysis · Operating model design
  4. Enterprise architecture

    A short written architecture whose standards are checked automatically in the delivery pipeline.

    Business capability mapping · Systems of record and data ownership · Integration architecture · Reference architectures and templates
  5. Technology advisory and independent review

    A written answer to one difficult technology question, based on evidence and delivered in two weeks.

    Architecture review · Platform and vendor selection · Technical due diligence · Program recovery assessment
  6. Technology modernization

    A decided fate for every system, and a funded order in which to carry it out.

    Estate inventory · System health assessment · Disposition decisions · Dependency mapping

What we believe about this work

  1. A strategy needs funding to take effect

    A direction turns into a strategy once money and people start to move. We end strategy work with decisions that each carry an owner, a budget line and a place in the sequence, along with a list of the work that stops, and if we cannot get that far we say so in writing and explain what is blocking it.

  2. Independence has to be structural

    Advice from a firm that also sells the license is shaped by that fact, however well-meaning the adviser may be. We resell nothing and represent no vendor, and we recommend on fit, total cost and your team's ability to run the result after we leave, which sometimes means telling you that the right answer is to change nothing.

  3. Small, enforced architecture standards get followed

    A thick standards document tends to be read once, by the people who wrote it. Engineers follow a handful of principles, a short list of approved choices and checks that run in the delivery pipeline, because following them is the easiest way to ship, so we write architecture for the engineers who have to work within it.

Signs you need this

If two or more sound familiar, it is worth a conversation
  • The roadmap holds more priority-one initiatives than the organization has teams to deliver them.
  • No one can name a project that was stopped before it was finished.
  • The architecture review board has a queue, and delivery teams have learned to work around it.
  • A platform or vendor decision is due, and each adviser at the table sells one of the options.
  • A large program reports green every month while its go-live date keeps slipping.
  • You are about to acquire, fund or inherit a technology estate that no independent party has examined.
  1. A two-week review

    A principal and a senior engineer read the code, the data and the plans, and talk to the people involved. You get a written assessment, the risks ranked by what would actually stop you, and a 90-day plan you can run with or without us.

  2. A build of about twelve weeks

    A dedicated team takes one use case to production and hands it to your people, with a release to staging every week and tests agreed up front as the definition of done.

  3. An embedded team

    Senior engineers working inside your tools and your standups, month to month, with a named principal accountable for the outcome.

  4. Managed operations

    After go-live we keep the system healthy: monitoring, on-call, cost control and a monthly improvement backlog, against service levels agreed in writing.

Where it applies

Industries where this practice does the most work

Questions buyers ask

The differences are mainly in size and in what we read. Our team is one principal and one senior engineer, and the two people who talk to your executives are the same two who open the repositories, the contracts and the cloud bills. What you receive is a short set of decision records and a funded sequence in place of a long deck, there is no license margin behind the advice, and the plan is written so that you can run it with or without us.

We do both, and we keep the two separable. A review or a strategy ends with a plan that your own team or another supplier can carry out. Asking us to build part of it is a separate decision with its own scope, which is usually a build of about twelve weeks that takes one use case to production. We write the advice so that it works without hiring us, because advice that depends on hiring the adviser cannot be independent.

We need an executive sponsor who owns the trade-offs and has the authority to stop work, time with the people who run the systems, and read access to the evidence, meaning code, contracts, budgets and incident records. Without the sponsor, the result tends to be a well-argued document that changes nothing, so we ask about sponsorship in the first conversation and, if it is missing, suggest a smaller piece of work that does not depend on it.

Most work starts with the two-week review, which has a fixed fee agreed up front and ends with a written assessment, a ranked list of risks and a plan for the next 90 days. A full strategy or target architecture takes longer, by an amount that depends on how many business units and systems are in scope, and we scope it once the review has shown what is there. A named principal stays on the work from the first call to handover.

Other practices

Send us a description of the problem and we will tell you what it would take to solve.

Tell us what you are trying to do and where it is stuck. A principal reads every message and replies within one working day.

How we engage

Start a conversation.

A short paragraph is enough. A principal reads every message and replies within one working day.

Or email hello@farside.works. We use what you send only to reply. Privacy