Any system that has been in operation for a while carries a list of things that ought to be fixed, such as a query that slows down as its table grows, a job someone restarts by hand every Monday, a library two major versions behind or a cloud resource still sized for a load test run long ago. The team usually knows the list well, but it never reaches the top, because each item is survivable for now and the roadmap is full. The cost builds up gradually in the form of slower delivery, more incidents and a rising run bill.
Good intentions rarely change this, and a one-off quarter devoted to cleanup tends to help only for a while. Improvement work loses to feature work because its value is never stated, whereas a feature comes with a sponsor and a date and a debt item has only an engineer's opinion behind it. For an improvement to compete, it needs evidence of what the problem costs now, a stated expected effect and a measurement afterwards that shows whether the effect arrived, at which point it can be ranked, funded and defended like any other investment.
We run this as a monthly cycle with reserved capacity, made up of a backlog ranked by measured cost, a fixed amount of engineering time, a set of items shipped and a before-and-after figure for each one. The scope is deliberately small, limited to changes that fit within a month and do not need a program around them. When an item turns out to need a redesign or a replacement we say so and pass it, together with the evidence gathered so far, to the people who decide on larger investments.